Perşembe, Kasım 09, 2006

AB 2006 Türkiye İlerleme Raporu

AB 2006 Türkiye ilerleme raporunda bizim projeden şu şekilde sözetmişler :)


Good progress can be noted with regard to monitoring and evaluation. After creating a department for monitoring and evaluation in 2004, the SPO adopted a monitoring and evaluation framework in 2006, determining the responsibilities of the actors in the process. A monitoring manual has been drafted and a common web-based Monitoring Information System (MIS) has been designed and put into use. Preparations in this area are starting. (Sayfa 54)

http://www.abgs.gov.tr
http://www.abgs.gov.tr/dokumanlar/ilerleme/Turkiye_Ilerleme_Rap_2006_EN.pdf